Modernisation of the biogas plant in Dobruška

Modernisation of the biogas plant in Dobruška
  • Electro System

    836 kW

    performance
  • Location

    Czech Republic

    country
  • Calendar

    2023

    year
  • Platform

    SandRA

    platform

New control system for more efficient operation

In 2023, we carried out a major modernization of the control system at the biogas plant in Dobruška. We replaced the original Simatic S7-300 with our SandRA system, which brought higher reliability and more efficient technology management. The modifications included replacing the PLC and I/O, creating new software and visualization with a modern operator station that allows easier control of the entire process.

Bps Animals

Extension to biomethane injection technology

In 2024, we expanded the station to include the control of new fermenters, feed storage and connection to the technology for purification and injection of biomethane into the distribution network. We supplied new electrical and MaR switchgear, which is now fully interconnected with the entire system. Thanks to this upgrade, the operator can better manage the energy produced and flexibly choose between selling electricity or gas.

SandRA Z210 compact solution

Learn more about the compact SandRA Z210 series and the possibilities of using existing I/O modules

/cs/platformy/sandra/ (extern� odkaz)

Supply history for biogas plants

  • 2011

    Implementation of control and monitoring system at 10 biogas plants in the Czech Republic

  • 2013

    Implementation of the control and monitoring system of the biogas plant in Bzovík and Dvorjanky in Slovakia

  • 2019

    Modernization of biogas plant management in the agricultural company Starosedlcký Hrádek with deployment of the SandRA platform

  • >>

    Permanent service support for all implemented solutions in the form of regular or random service