Generator excitation

Turbogenerator excitation
Turbogenerator excitation is implemented according to the type of excitation system as one of the following solutions: AVR Safety, AVR Power, or AVR Compact. The AVR Z110 regulator is designed as a single-board module and includes thyristor phase control, programmable logic devices (PLDs), two ARM-based microcontrollers, and communication adapters for USB, RS232, and Ethernet.
The regulator's control panel is integrated into the cabinet door along with a keypad. The panel features several types of screens that provide complete information on the status of the excitation system and the generator’s measured values. It also includes control buttons for local excitation operation. A similar control panel is available for installation in the unit control room.
The turbogenerator excitation control system can be extended with a generator synchronizer, implemented using the DSD Z110 module, which is also a single-board design and includes analog measurement inputs, programmable logic devices, two ARM-based microcontrollers, and communication adapters for USB, RS485/422, and Ethernet.
The AVR Safety excitation regulator complies with Category C safety functions according to ČSN EN 61226 and is implemented on the SandRA platform. It is communication-connected to the Unit Control and Information System (UCIS).
Diesel generator excitation
Diesel generator excitation is implemented using the AVR Safety system.
The diesel generator is intended for emergency power supply to the primary circuit of the nuclear power plant. The excitation system ensures precise regulation of the generator stator voltage and other parameters related to generator control by adjusting the excitation current.
The system performs Category A safety functions according to ČSN EN 61226. It is implemented on the SandRA Z110 platform. The regulator is communication-connected to the Unit Control and Information System (UCIS).
The diesel generator excitation control system, supplied by ZAT a.s., can be designed and implemented according to customer requirements, either as a complete system replacement or as a partial retrofit of the excitation control section.

Main functions of the voltage regulator:
- Voltage and reactive power regulation
- Voltage matching before synchronizing the generator to the grid
- Zero reactive power setting before disconnecting the generator from the grid
- Regulation of the excitation current during tests and loss of stator voltage measurement
- Inverter operation of a thyristor rectifier for operational excitation of the generator
- Stator and rotor current limiters
- Voltage limiter and U/f limiter
- Under-excitation limiter
- System stabilizer
- Generator phaser
- PLC controller, fault diagnostics, and automatic switching between channels

Function of the synchronization device:
Automatic closing of the generator circuit breaker
Monitoring and control of closing
Important references
-
21st kindergarten Na Celchu
-
Hněvkovice hydroelectric structure
-
Dispatcher control for LDS – Railway Administration
-
Reconstruction of the station building at Plzeň hl. n.
-
Reconstruction of the station building at České Budějovice hl. n.
-
Pakš Nuclear Power Plant
-
Research reactor and auxiliary technologies for the Institute of Nuclear Research "Řež"
-
Dukovany Nuclear Power Plant
-
Opatovice Power Plant
-
Power plant Felton, Cuba
-
Hydropower plant Gabčíkovo
-
Liptovská Mara pumped storage hydropower plant
-
Pilsen heating plant
-
Hydroelectric power plant Lipno I
-
Small hydropower plant Kořensko
-
Mělník I Power Plant
-
WWTP Mníšek pod Brdy
-
Central distribution control room for GasNet
-
Management and analysis of cathodic protection - Pražská plynárenská
-
Emerson Climate Technologie
-
Denso manufacturing Czech s.r.o.
-
Project documentation for Štramberk UGS
-
Continental Automotive CZ
-
SAINT-GOBAIN, world leader in the building materials market
-
Life card
-
Modernisation of the biogas plant in Dobruška
-
Biogas station Bzovík
-
Starosedlský Hrádek biogas station with SandRA control system
-
Mrákov biogas station with Siemens control system
-
Elementary school "Masarykova" in Klatovy
-
Alzheimer Center Roztoky
-
Telemetry stations for GasNet s.r.o.
-
Gas transfer station for the company EG.D
-
Emergency depressurization - UGS Štramberk
-
Landslide detection in Mosty u Jablunkova
-
Landslide detection in Karlovy Vary
-
Implementation of the I.P.P.E. Dýšiná technical control room
-
"Ejpovice" Tunnel
-
Dispatch centers of the regional directorates of the Railway Association
-
Information system to support the sale of apartments, houses and plots
-
SimONet helps to save energy in the FC Viktoria Plzeň academy building
-
Gallery Klatovy / Klenová
-
Health center in pocket
-
Information system to support the sale of apartments, houses and plots
-
Health at the click
-
Electronics manufacturing for demanding industries
-
Production of the SandRA control system
-
Municipal water management Třeboň
-
Heating plant Náchod
-
Small incinerator Evecont - C-Energy Planá
-
Loviisa Nuclear Power Plant
-
Enguri Hydroelectric Power Plant
Excitation system replacement – TG2
Georgia, 2025
-
Hydroelectric Power Plant Štěchovice – TG3
Excitation migration of TG3
CZ, 2024
-
10 excitation units at hydroelectric power plants – Slovakia
Modernization of 10 excitation units
Slovakia, 2024
-
Kyzylorda Power Plant
Delivery of turbine turning synchronization
KAZ, 2024
-
Chvaletice Power Plant
Delivery of turbine turning synchronization
CZ, 2024
-
Golfech Nuclear Power Plant
Delivery of KCF system (2x PWR 1330)
France, 2024
-
Gas transfer station Hospozín
Control system reconstruction
CZ, 2023
-
Opatovice Power Plant
Replacement of control system and field instrumentation - TG3
CZ, 2023
-
Plzeňská teplárenská - TGS
Delivery of turbine turning synchronization
CZ, 2023
-
Jafurah Cogeneration Power Plant
Delivery of turbine turning synchronization
SAE, 2023
-
Tanajib Cogeneration Power Plant
Delivery of 2 turbine turning synchronization systems
SAE, 2023
-
Temane Thermal Power Plant
Delivery of turbine turning synchronization
Mozambik, 2023
-
Olefin chemical plant
Delivery of 2 turbine turning synchronization systems
Polsko, 2023
-
Waterworks Lipno
Modernization of the control system on the SandRA platform
CZ, 2022
-
Custom production
Production of 140 pieces of a medical device for a customer
CZ, 2022
-
Gas transfer control station Makotřasy
Control system reconstruction
CZ, 2022
-
Slough waste incineration plant
Delivery of turbine turning synchronization
Velká Británie, 2022
-
Belleville Nuclear Power Plant
Delivery of KCF system (2x PWR 1330)
France, 2022
-
Transfer control station Krupá
Control system and boiler room reconstruction
CZ, 2021
-
Cathodic protection station Skalice nad Svitavou
Wireless measurement from cathodic protectors
CZ, 2021
-
Heating plant Příbram
Reconstruction of the boiler control system due to transition to another fuel
CZ, 2021
-
Heating plant in Tabor
Migration of the boiler control system in connection with fuel change
CZ, 2021
-
Biogas station Dlouhá Lhota
Supply of control system and monitoring system with Simatic S7-300 PLC and Reliance visualization
Czech Republic, 2021
-
WWTP Tuchlovice
Delivery of Schneider control and monitoring system
CZ, 2021
-
Coal preparation Ledvice
Delivery of Siemens S7 1500 control system for coal conveyor belt control
CZ, 2021
-
Waterworks Žilina
Reconstruction of excitation controllers TG1 and TG2
SK, 2021
-
Railway line Oldřichov u Duchcov - Bílina
Implementation of Remote Diagnostics and Technological Systems
CZ, 2021
-
Railway station Strakonice
Addition of Remote Diagnostics of Technological Systems
CZ, 2021
-
Dubai waste incineration plant
Delivery of turbine turning synchronization
SAE, 2021
-
Lostock waste incineration plant
Delivery of turbine turning synchronization
Velká Británie, 2021
-
Kemi waste incineration plant
Delivery of turbine turning synchronization
Finsko, 2021
-
Transfer station Libenice
Control system and boiler room reconstruction
CZ, 2020
-
Railway station Jaroměř
Reconstruction and implementation of Remote diagnostics of technological systems
CZ, 2020
-
Plzeň junction, 3rd construction - Domažlice railway crossing
Implementation of Dispatching Control Technology
CZ, 2020
-
Underground storage tank Štramberk
Reconstruction of the compressor station control system
CZ, 2020
-
Nogent-Sur Seine Nuclear Power Plant
Delivery of KCF system (2x PWR 1330)
France, 2020
-
Compression station Veselí nad Lužnicí
Control system of the pipe yard
CZ, 2019
-
Distribution node Rozvadov
Control system reconstruction
CZ, 2019
-
Empalme Thermal Power Plant I,II
Delivery of 2 pieces of excitation generators 300 MW
Mexico, 2019
-
Acerra incinerator
Upgrade of steam turbine control system from Simatic - Simadyn instrumentation to Simatic S7-400 instrumentation
Italy, 2019
-
Temelín Nuclear Power Plant
Reconstruction of the I&C wastewater treatment plant, project B607
CZ, 2019
-
Metsamor Nuclear Power Plant
Unit 2 - control system for group and individual control of VVER 440 nuclear reactor rods
Armenia, 2019
-
Railway line Týniště nad Orlicí - Broumov
Implementation of Dispatcher Control Technology and Remote Diagnostics of Technological Systems
CZ, 2019
-
Penly Nuclear Power Plant
Delivery of KCF system (2x PWR 1330)
France, 2019
-
Grati Thermal Power Plant
Delivery of the steam turbine control and protection system, field instrumentation, and cabling
Indonesia, 2019
-
Škoda Auto
Support for shop floor management through visualisation of production data on electronic boards
CZ, 2018
-
Underground storage tank Štramberk
Reconstruction of the control system of the drying and regeneration section
CZ, 2018
-
Mochovce Nuclear Power Plant
Replacement of the Group and Individual Control System for Reactor Control Mechanisms (RRCS), Unit No. 1 and No. 2
Slovakia, 2018
-
Health +
Making pharmacy report data, test results and recommended medications available to patients
ČR, 2017
-
Heating plant Katowice
Reconstruction of turbine control system, reconstruction of 120 MW generator excitation
Poland, 2017
-
Waterworks Kořensko
Modernization of the control system on the SandRA platform
CZ, 2017
-
Jirkal Komaxit
Replacement of the existing relay control of the spray line with the modern ZAT SandRA Z210 series control system
CZ, 2017
-
Flamanville Nuclear Power Plant
Delivery of KCF system (2x PWR 1330)
France, 2017
-
CEPS
Specialized system providing advanced process support across the company CEPS
Czech Republic, 2016
-
Heating plant Písek
Reconstruction of electrostatic precipitator source control - boilers K11 and K12
CZ, 2016
-
Lisbjerg Incinerator
Delivery of the steam turbine control system, related field instrumentation, and cabling
Denmark, 2016
-
Thermal Power Plant Morupule
Delivery of synchronization of turbine rotating equipment
Botswana, 2016
-
Hanhikivi Nuclear Power Plant
Implementation of part of the conceptual project of the Group Control System, Unit 1
Finland, 2016
-
Cattenom Nuclear Power Plant
Delivery of KCF system (4x PWR 1330)
France, 2016
-
Saint-Alban Nuclear Power Plant
Delivery of KCF system (2x PWR 1330)
France, 2016
-
Jaslovské Bohunice Nuclear Power Plant
Replacement of the Group and Individual Control System for Reactor Control Mechanisms (RRCS), Units 3 and 4
Slovakia, 2016
-
Small hydroelectric power plant Střekov
Modernization of excitation regulators TG1 to TG3
CZ, 2016
-
HEC Services
Intelligent system for automatic collection, processing and application of data on electricity supply and consumption
CZ, 2015
-
Thermal Power Plant Gardabani
Supply of steam turbine control and protection system, field instrumentation and cabling
Georgia, 2015
-
Paluel Nuclear Power Plant
Delivery of KCF system (4 x PWR 1330)
France, 2015
-
School reactor CTU, FJFI Prague
VR-1 school training reactor information system including web services
CZ, 2015
-
Biogas station Slatina
Supply of control system and monitoring system, including connection to heat conductor
Czech Republic, 2014
-
CZ LOKO
System for financial management, budgeting, controlling and forecasting
Czech Republic, 2014
-
Emerson Climate Technologies
Custom information system for collaboration between engineering and test lab
CZ, 2014
-
Heating plant Strakonice
K2 boiler control, new application software including visualization
CZ, 2014
-
Trams in Turkey
Air conditioning inverters for trams Konya Turkey
Turkey, 2014
-
Biogas station Stanoviště
Supply of control system and monitoring system
Czech Republic, 2013
-
Heating plant Dvůr Králové
Delivery of SW works of acoustic cleaners of K2 output superheater
CZ, 2013
-
Zellstoff Stendal GmbH Incinerator
Delivery of the steam turbine control system, related field instrumentation, and cabling
Germany, 2013
-
Biogas station Mýšlovice
Supply of control system and monitoring system
Czech Republic, 2012
-
Biogas station Dvorianky
Supply of control system and monitoring system
Slovakia, 2012
-
Thermal Power Plant Vojany
Reconstruction of turbine controller B16
SK, 2012
-
Biogas station Smolotely
Supply of control system and monitoring system with Simatic S7-300 PLC and Reliance visualisation
Czech Republic, 2012
-
Thermal Power Plant Talkha
Replacement of generator excitation, reconstruction of turbine control system
Egypt, 2011
-
CBRE Global Investors Central Europe
Applications for commercial buildings supporting the budget-making processes and their approval
Europe, 2009
-
Čepro
Extranet solution for recording, processing and analysis of corrosion cathodic protection data
CZ, 2007
-
Innogy
Extranet solution for recording, processing and analysis of corrosion cathodic protection data
CZ, 2007
-
Mero
Extranet solution for recording, processing and analysis of corrosion cathodic protection data
CZ, 2007
-
South Ukrainian Nuclear Power Plant
Control system for group and individual control of nuclear reactor rods VVER 1000, Units 2 and 3
Ukraine, 2005
-
Chmelnicka Nuclear Power Plant
Control system for group and individual rod control of VVER 1000 nuclear reactor, unit 2.
Ukraine, 2004
-
Rovenská Nuclear Power Plant
Control system for group and individual control of control units/rods of VVER 1000 nuclear reactor, unit 4.
Ukraine, 2004
-
Zaporozhye Nuclear Power Plant
Control system for group and individual control of the rods of the VVER 1000 nuclear reactor, Units 3 and 4.
Ukraine, 2004
-
Compass Group
Collection and processing of accounting data in a distributed branch accounting system
Czech Republic, 2000
Want to know more? Contact us!


František Kural
Guarantor of thermal and hydropower sector
frantisek.kural@zat.cz
+420 736 519 256